Test train reaches 275km/h in Ceneri Base Tunnel - International Railway Journal

[Presseaussendung, Newslink]
von AIM

An ICE-S measuring train on loan to AlpTransit Gottard has reached 275km/h in the new 15.4km Ceneri Base Tunnel under the Swiss Alps.